Phase 8 — Publish #8

Closed
opened 2026-07-29 16:38:19 +03:00 by oleks · 1 comment
Owner

Per design/tasks.md Phase 8. Depends on Phase 7 acceptance.

  • 8.1 README with the thesis, rubric summary, and worked examples
  • 8.2 Publish per plugin-publishing: push, index entry in ~/projects/claude-plugin-index/plugins.json, verify claude-plugins.oleks.space/api/plugins, claude plugin add
  • 8.3 Optional, from decision 0.1: PR cc-tokens attribute --by skill|plugin to token-budget
  • 8.4 Memory checkpoint — rubric and calibration findings into wing_claude_memory/working-practice (superseded slightly: initial findings already saved to wing claude-plugins rooms plugin-build/decisions/gotchas on 2026-07-29 — reconcile at publish time)

Not started.

Per design/tasks.md Phase 8. Depends on Phase 7 acceptance. - [ ] 8.1 README with the thesis, rubric summary, and worked examples - [ ] 8.2 Publish per plugin-publishing: push, index entry in `~/projects/claude-plugin-index/plugins.json`, verify `claude-plugins.oleks.space/api/plugins`, `claude plugin add` - [ ] 8.3 Optional, from decision 0.1: PR `cc-tokens attribute --by skill|plugin` to token-budget - [ ] 8.4 Memory checkpoint — rubric and calibration findings into `wing_claude_memory`/`working-practice` (superseded slightly: initial findings already saved to wing `claude-plugins` rooms `plugin-build`/`decisions`/`gotchas` on 2026-07-29 — reconcile at publish time) Not started.
oleks added this to the v0.1.0 milestone 2026-07-29 16:38:19 +03:00
oleks added a new dependency 2026-07-29 16:38:32 +03:00
Author
Owner

README rewritten (commit ba445cf) — was stale "scaffolding, pre-implementation" text at v0.5.1 despite two real audits already filed; now documents usage, the six pipeline steps, the rubric's four positions, and three worked examples from real runs.

Publish scoped to local use per explicit user decision: plugin was already registered in the oleks-local marketplace since Phase 1 (task 1.2c); deliberately NOT added to the public claude-plugin-index or verified on claude-plugins.oleks.space — recorded in design/tasks.md 8.2 as a decision, not an oversight.

Task 8.3 (optional PR to token-budget) stays open/deferred, not required for this release. Task 8.4 (memory checkpoint) already satisfied on an ongoing basis via FR-9's automatic writes plus manual session checkpoints.

Version bumped to 0.6.0.

README rewritten (commit ba445cf) — was stale "scaffolding, pre-implementation" text at v0.5.1 despite two real audits already filed; now documents usage, the six pipeline steps, the rubric's four positions, and three worked examples from real runs. Publish scoped to local use per explicit user decision: plugin was already registered in the oleks-local marketplace since Phase 1 (task 1.2c); deliberately NOT added to the public claude-plugin-index or verified on claude-plugins.oleks.space — recorded in design/tasks.md 8.2 as a decision, not an oversight. Task 8.3 (optional PR to token-budget) stays open/deferred, not required for this release. Task 8.4 (memory checkpoint) already satisfied on an ongoing basis via FR-9's automatic writes plus manual session checkpoints. Version bumped to 0.6.0.
oleks closed this issue 2026-07-30 04:44:47 +03:00
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Depends on
#7 Phase 7 — Acceptance
kotkan/claude-plugin-inference-arbitrage
Reference: kotkan/claude-plugin-inference-arbitrage#8